检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何友国 邢宏伟 黄建明 He Youguo;Xing Hongwei;Huang Jianming(HBIS Group Tangsteel Company,Tangshan,Hebei,063016;North China University of Technology,Tangshan,Hebei,063210)
机构地区:[1]河钢集团唐钢公司,河北唐山063016 [2]华北理工大学,河北唐山063210
出 处:《河北冶金》2020年第2期50-54,共5页Hebei Metallurgy
摘 要:介绍了河钢唐钢2#高炉“炉缸不放残铁”的开炉达产过程,阐述了其中技术难点。针对因不放残铁开炉后易铁口凝死、炉缸冻结的问题,通过有针对性地在清理炉缸残料、烘炉、开炉料装入、炉前出铁准备、送风风口布置等几方面做周密部署,渣铁的排出条件得到了极大改善,使得渣铁可顺利排出,且流动性良好,实现了高炉安全快速开炉,并短期内迅速达产。This paper introduces the process of"no residual iron on hearth"of 2#blast furnace of HBIS Tangsteel and expounds the technical difficulties.In view of the problem that the tapping and hearth is easy to be frozen when the residual iron is not put into the furnace,through the targeted arrangement of clearing the hearth remnant,baking,charging of opening materials,preparation for taping,arrangement of air supply outlet,etc,The discharge condition of slag iron has been greatly improved,which makes the slag iron discharged smoothly with good fluidity.The blast furnace can be opened safely and quickly,and the production can be reached quickly in a short time.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.176