作 者:程龄 CHENG Ling(Dongfang Electric Engineering&Consulting Co.Ltd,611731,Chengdu,China)
机构地区:[1]东方电气(成都)工程设计咨询有限公司,成都611731
出 处:《东方电气评论》2020年第1期84-88,共5页Dongfang Electric Review
摘 要:本文为已实施工程的总结,针对某电厂二期扩建在17.00米的厂房楼层上需增加180多吨大型设备荷载的工艺需求,利用新技术、新材料、新工艺,提出了对钢筋混凝土梁组合加固方法,大幅度的提高了钢筋混凝土梁、柱的抗弯抗剪承载能力,同时还使框架结构整体保持了良好的抗震性、延性。同时支承设备的新增次梁采用T型断面分别受力,巧妙的解决了补强结构抗剪可靠度不足的问题。This article is a summary of a project that has been implemented.In response to the process requirements for the expa nsion of a power plan t that requires more than 180 tons equipme nt loads on the 17.00 m floor,new tech no logies,new materials,and new processes are used to propose a combination strengthening method for the reinforced concrete beam.This method greatly improves the bending and shear beari ng capacity of reinfo reed con crete beams and colum ns,and also maintains the frame structure as a whole with good seismic resista nee and ductility.At the same time,T一sections are adopted for the newly added sec on dary beams that support the equipment in dividually,which solves the problem of insufficient shear reliability of the reinforced structure.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7