检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:守继承 郭晶 SHOU Ji-cheng;GUO Jing(China Road and Bridge Corporation,Beijing 100011,China;Beijing Road Engineering Cost Quota Management Station,Beijing 100000,China)
机构地区:[1]中国路桥工程有限责任公司,北京100011 [2]北京市道路工程造价定额管理站,北京100000
出 处:《价值工程》2020年第7期121-122,共2页Value Engineering
摘 要:固定总价合同有利于业主控制投资规模,同时有利于总承包商控制分包成本,因此固定总价合同模式在境外合同管理中得到了广泛应用。明确总价包干的风险范围,掌握总价合同模式下清单计价的计量与支付方式对做好合同管理有重要的意义。The fixed total price contract is beneficial to the owner to control the investment scale,and it is also beneficial to the general contractor to control the cost of subcontracting.Therefore,the fixed total price contract model has been widely used in overseas contract management.Clarifying the risk scope of the total price contract,and mastering the measurement and payment methods of list pricing under the total price contract model are of great significance for good contract management.
分 类 号:TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249