黄土隧道施工过程中的沉降变形控制  被引量:3

Controlling the Settlement and Deformation During the Construction of Loess Tunnels

在线阅读下载全文

作  者:李智 LI Zhi(The 2nd Engineering Co.Ltd.of China Railway 17 Bureau Group Corporation,Xi'an 710115,China)

机构地区:[1]中铁十七局集团第二工程有限公司,西安710115

出  处:《工程建设与设计》2020年第6期92-93,共2页Construction & Design for Engineering

摘  要:结合蒙西至华中地区铁路煤运通道工程银山2号隧道具体工程特点,针对黄土隧道的特性,采取切实可行的支护参数和施工工艺,探讨施工过程中控制沉降变形的措施,从而达到施工工程中控制地表及拱顶沉降的目的。Combining the specific engineering characteristics of Yinshan No.2 tunnel with the railway coal transportation channel project from Mengxi to Central China, according to the characteristics of the loess tunnel, practical support parameters and construction techniques are adopted to discuss measures to control settlement and deformation during construction, in order to control ground and vault settlement during construction.

关 键 词:软弱围岩 施工控制 沉降控制 

分 类 号:U25[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象