检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘鹏程[1] 代沛芩 Pengcheng Liu;Peiqin Dai(Chengdu Hydropower Construction Engineering Co.,Ltd.,China No.7 Water Resources and Hydropower Engineering Bureau,Wenjiang,Sichuan,611130,China)
机构地区:[1]中国水利水电第七工程局成都水电建设工程有限公司,四川温江611130
出 处:《工程技术与管理(新加坡)》2019年第10期83-86,共4页Engineering Technology & Management
摘 要:阳江抽水蓄能电站位于广东省阳春市与电白县交界处的八甲山区,电站开发任务以输水发电为主,电站上水库设计总库容2836.5万m2,下水库总库容3105万m2,规划装机容量2400MW,分两期建设。引水支管围岩以Ⅰ、Ⅱ类围岩为主,并发育有fy1、fy2、f712和fs702共4条断层带,需要对其进行高压固结灌浆处理。This paper takes the domestic project of Taizhou City,an emergency treatment project for the bank collapse of Jiangsu section of the Yangtze River as an example,to introduce the development of its fish breeding and release work;analyzes the positive effect of breeding and release on its ecological compensation,and summarizes the current stage on this basis The shortcomings of fish breeding and release in the Yangtze River and suggestions for improvement were put forward.
关 键 词:阳江 抽水蓄能 引水支管 粗粒花岗岩 断层带 高压 无盖重 灌浆技术
分 类 号:TV7[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38