检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郁伟 郑军 刘雄 莫恩 YU Wei;ZHENG Jun;LIU Xiong;MO En(Jiangsu Provincial Yangzhou Municipal Highway Management Division,Yangzhou 225009,China;China Coal Guanghua Geological Engineering Company Limited,Handan 056000,China;No.2 Engineering Company Limited,China Tiesiju Civil Engineering Group,Suzhou 215100,China)
机构地区:[1]江苏省扬州市公路管理处,江苏扬州225009 [2]中煤光华地质工程有限公司,河北邯郸056000 [3]中铁四局集团第二工程有限公司,江苏苏州215100
出 处:《建井技术》2019年第6期13-16,共4页Mine Construction Technology
摘 要:流砂层封水一般采用注浆、冻结等单一施工技术。对扬州市城市南部快速通道荷花池隧道泵房北侧的灌注桩和隧道结构、灌注桩和三轴搅拌桩之间严重扰动的流砂层,采用先注浆、后冻结联合技术治理,竖井和泵房封水取得良好效果,对类似工程项目有借鉴意义。Water sealing of a quick sand bed generally would be conducted with a grouting,ground freezing and other single construction technology.A first grouting and then ground freezing combined technology was applied to control the serious disturbance quick sand bed between the cast in place piles and tunnel structure,the cast in place piles and three axes mixed piles at the north side of the pumping chamber in the Hehuachi Tunnel of the south fast channel in Yangzhou City.Good results were came from the water sealing of the tunnel shaft and pumping chamber and could be the reference significances to the similar engineering projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.161.96