检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:戴一正 程泰宁[2] 陈璞(翻译) DAI Yizheng;CHENG Taining;CHEN Pu(School of Architecture,Southeast University;Chinese Academy of Engineering;不详)
机构地区:[1]东南大学建筑学院 [2]中国工程院 [3]不详
出 处:《建筑实践》2019年第9期16-23,共8页Architectural Practice
摘 要:前言随着国家"八纵八横"高速铁路网的快速建设,铁路客站及其周边配套工程也在沿线各城市中同步建设。截至目前,我国高速铁路通车里程超过30,000km,累计新建成各类铁路客站650余座,覆盖近80%的主要城市。1.Preface With the rapid construction of the national"Eight Vertical and Eight Horizontal"high-speed railway network,the railway passenger station and its surrounding supporting projects are being simultaneously constructed in various cities along the route.Up to now,China's high-speed railway operation length covers over 30,000 km,and more than 650 new railway passenger stations have been built,covering nearly 80% of major cities.According to the statistics of National Railway Administration,more than 5 trillion yuan has been invested in railway construction in the past ten years.Especially in 2018,the investment was more than 800 billion yuan,most of which was used for high-speed railway construction.There has been a wide concern about how to rely on the spillover effect of high-speed railway construction to promote the development of an integrated station-city.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222