检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:夏润亮[1] 李涛[1,2] 余欣[1] 夏军强[2] 张俊华[1] XIA Runliang;LI Tao;YU Xin;XIA Junqiang;ZHANG Junhua(Yellow River Institute of Hydraulic Research,YRCC,Zhengzhou 450003,China;State Key Laboratory of Water Resources and Hydropower Engineering,Wuhan University,Wuhan 430072,China)
机构地区:[1]黄河水利委员会黄河水利科学研究院,河南郑州450003 [2]武汉大学水资源与水电工程国家重点实验室,湖北武汉430072
出 处:《水科学进展》2020年第2期184-193,共10页Advances in Water Science
基 金:国家重点研发计划资助项目(2018YFC0407905);国家自然科学基金资助项目(51679103)。
摘 要:小浪底水库异重流的形成与运行规律是关系黄河调水调沙方案拟定的重要指标。基于现场调研、理论探讨与预测分析结合等手段,明晰了2018年“腾库迎洪”期小浪底水库来水来沙过程,根据水库调度与库区淤积形态等边界条件,观测了异重流的形成与运行,采用基于流速分布的水库异重流潜入点预测公式进行了计算分析。结果表明:2018年7月库区产生的剧烈冲刷,在潜入点处发生大量淤积,水深大幅减小,引起潜入点下移;潜入点位置随入库水沙增大、坝前水位降低及库区淤积的推进向坝前移动,计算与实测结果反映了该变化过程。The formation and creeping of the density current in the Xiaolangdi Reservoir are important indices of the water scheme and sediment regulation in the Yellow River.Previous studies have focused on the theory of density current in the Xiaolangdi Reservoir,real-time tracking on the operation process,and the analysis of surveyed data;however,they did not include related research on real-time prediction of the Xiaolangdi Reservoir and the tracking analysis of latest theoretical results.In this study,a field investigation,theoretical analysis,and prediction analysis were conducted to explain the process of water and sediment inflow from the Xiaolangdi Reservoir,during the period of discharging before the flood in 2018.The formation and creeping of the density flow were observed according to boundary conditions such as reservoir operation and reservoir siltation morphology.The plunging point formula of the density flow in the reservoir was predetermined,based on the velocity distribution.The results show that,in July 2018,intense scouring in the reservoir caused a significant amount of siltation to fall at the plunging area,thereby considerable decreasing the depth of clear water.This caused the plunging point to move downstream.The position of the plunging point moved ahead of the dam with the increase in water and sediment inputs,decrease of water level before the dam,and advance of the siltation in the reservoir.The calculated and measured results reflect on the changing process.These results can be used as a reference for the preparation and post-evaluation of reservoir water and a regulation plan for sediments.The results can also provide technical support for the operation as well as planning and design of reservoirs in sediment-laden rivers.
分 类 号:TV143[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15