检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁毅灵 牛峥[1] LIANG Yi-ling;NIU Zheng(Guangzhou Bureau of China Southern Power Grid Co.,Ltd.,EHV Transmission Company Guangzhou,Guangdong 510000)
机构地区:[1]中国南方电网有限责任公司超高压输电公司广州局,广东广州510000
出 处:《新型工业化》2020年第1期20-24,共5页The Journal of New Industrialization
摘 要:换流变压器在长期过负荷下运行时,将在不同程度上缩短其寿命,应尽量减少出现这种运行方式的机会;必须采用时,应尽量缩短超额定电流运行的时间,降低超额定电流的倍数,并投入全部的冷却器。本文针对特高压直流换流变PLC控制系统中关于"过负荷"信号的逻辑进行梳理,并且分析导致"过负荷"信号误发的原因。When the converter transformer is operated under long-term overload, its life will be shortened to varying degrees, and the chance of this operation mode should be minimized;when it must be adopted, the time of over-rated current operation should be minimized and the over-rated A multiple of the current and put into the full cooler. This paper reviews the logic of the "overload" signal in the UHV DC converter rheological PLC control system, and analyzes the reasons that cause the "overload" signal to be sent incorrectly.
分 类 号:TM721[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3