检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王海林 胡浩 郑武 丁剑 Wang Hai-lin;Hu Hao;Zheng Wu;Ding Jian
机构地区:[1]中国电力工程顾问集团西南电力设计院有限公司,四川成都610021
出 处:《电力系统装备》2020年第4期62-63,共2页Electric Power System Equipment
摘 要:文章通过对川西锦官梯级水电站送出通道现已存在的潮流N-1过载问题,以及随着电网发展即将面临的个别站点短路电流超标问题的分析,推荐在锦东—裕隆500 kV线路加装串联电抗器,实现同时解决上述两个问题的目的。In this paper,based on analysis about the problems evolution of the Jinping and Guandi cascade hydropower stations send out 500 kV transmission lines and stations or converter station,one problem is the current N-1 overload that is already faced in the existing power grid,another problem is the short-circuit current overshoot that will be faced with the development of the power grid in two years.In order to solve the above two problems,this paper recommend to installment series reactor in the Jinping Dong hydropower station to Yulong converter station 500 kV lines.
分 类 号:TM76[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.42