检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王常霖 姜树仁 李宝存 刘金涛 Wang Changlin;Jiang Shuren;Li Baocun;Liu Jintao(First Construction Co.,Ltd.,China Construction Eighth Bureau,Jinan,250000)
出 处:《建设科技》2020年第5期29-35,共7页Construction Science and Technology
摘 要:我国高速铁路建设飞速发展,铁路建设工程、站房工程及配套房建工程日益增多,高铁站房体量越来越大,装饰装修项目对品质的要求越来越高。高铁站房等公共建筑类高跨空间吊顶由于其跨度大、高度高、施工面积大等特点,与普通吊顶装饰装修有较多不同。依托济青高速铁路红岛站项目及鲁南高铁临沂北站项目,对高跨空间下的曲面吊顶结构固定技术、逆向法施工、装配式工艺及BIM+深化设计技术综合应用进行全面地研究,以期对类似工程提供借鉴和参考价值。The rapid development of high-speed railway construction in our country has witnessed an increasing number of railway construction projects,station building projects,and auxiliary building construction projects.The volume of high-speed rail station buildings has become larger and larger,and the quality of decoration has been increasingly sought after.High-span space ceilings for public buildings such as high-speed railway stations and buildings are very different from ordinary ceiling decoration due to their characteristics of large span,high height,and large construction area.Based on the Hongdao Station Project of Jiqing High-speed Railway and the Linyi North Station Project of Lunan High-speed Railway,this paper studies the comprehensive application of fixing technology,reverse construction,assembly process and BIM+deepening design technology in curved ceiling structure under high-span space,which could provide certain reference value for similar projects.
关 键 词:高铁站房 高跨空间 异形吊顶 深化设计 逆向法 装配式 BIM+
分 类 号:TU741[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7