检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:殷晶 YIN Jing(POWERCHINA Guiyang Engineering Corporation Limited,Guiyang 550081,China)
机构地区:[1]中国电建集团贵阳勘测设计研究院有限公司,贵阳550081
出 处:《水利科技与经济》2020年第4期72-75,共4页Water Conservancy Science and Technology and Economy
摘 要:对于引水系统基本不变的水电站扩机工程,由于机组引用流量增加,导致引水系统水头损失增大。为确保电站扩机改造方案的可行性,需重新复核电站扩机后的调节保证计算,通过对国外某水电站工程实例的剖析,对扩机工程调节保证计算时发现的问题提出几点建议。For the expansion project of hydropower station which diversion system is basically unchanged,the head loss of diversion system increases due to the increase of unit flow.In order to ensure the feasibility of the expansion project,it is necessary to check the calculation of regulation guarantee after the expansion of hydropower station.This paper focuses on the analysis of an engineering example of a hydropower station abroad.Suggestions are made on the problems found in the calculation of regulation guarantee for expansion projects.
分 类 号:TV74[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38