检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈盼 CHEN Pan(Xi'an Research Institute Co.,Ltd.,China Coal Technology and Engineering Group Corp.,Xi'an 710077,China)
机构地区:[1]中煤科工集团西安研究院有限公司,西安710077
出 处:《煤炭技术》2020年第3期34-36,共3页Coal Technology
摘 要:针对软弱破碎围岩巷道易发生底鼓的问题,分析认为软弱破碎围岩巷道由于围岩强度低,裂隙发育且可能受水的影响,不易在浅部形成承载结构,在"强顶强帮弱底"支护条件下,易发生底鼓。提出此类巷道支护应该把底板支护上升到和帮顶支护同等重要的位置,且要尽可能地使底板支护和帮顶支护协调统一起来,形成一个完整的承载体,从弥补巷道围岩承载力短板的角度出发,把反底拱应用到软弱破碎围岩巷道底板控制中,并通过工程实例,详细说明了反底拱的构建过程。Aiming at the problem of floor heave in weak and fractured surrounding rock roadway, the analysis shows that the floor heave is easy to occur in weak and fractured surrounding rock roadway because of the low strength of surrounding rock, the development of cracks and the possible influence of water, and it is not easy to form a bearing structure in shallow part. Under the condition of "strong roof, strong side and weak bottom" support, the floor heave is easy to occur. It is pointed out that the floor support should be raised to the same important position as the roof support, and the floor support and roof support should be coordinated as far as possible to form a complete bearing body. From the angle of making up the short slab of the bearing capacity of the surrounding rock of the roadway, the reverse floor arch should be applied to the floor control of the roadway with weak and fractured surrounding rock, and it is explained in detail through an engineering example. The construction process of inverted arch is discussed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.248.199