综合管廊施工控制及重难点分析  

Construction Control and Analysis of Major and Difficult Points in Comprehensive Pipe Gallery

在线阅读下载全文

作  者:任清波 刘春萍 王健[3] REN Qing-bo;LIU Chun-ping;WANG Jian(GuangZhou NanSha Engineering Company of CCCC Fourth Harbor Engineering Co.,Ltd.;CCCC FHEC Harbor Engineering Design Co.,Ltd.;Architectural Design and Research Institute of Guangdong Province)

机构地区:[1]中交四航局广州南沙工程有限公司 [2]中交四航局港湾工程设计院有限公司 [3]广东省建筑设计研究院

出  处:《智能建筑与智慧城市》2020年第4期123-124,共2页Intelligent Building & Smart City

摘  要:文章借助工程实例,介绍了综合管廊工程结构设计、附属设施系统设计及施工方案,总结了综合管廊设计及施工的重点、难点,分析综合管廊存在的制约因素、主要问题及建议。With the help of engineering examples,this paper introduces the structure design,auxiliary facility system design and the construction scheme of the comprehensive pipe gallery,summarizes the key points and difficulties of the design and construction of the comprehensive pipe gallery,and analyzes the existing constraints,main problems and suggestions of the comprehensive pipe corridor.

关 键 词:综合管廊 设计方案 施工方案 难点分析 

分 类 号:TU990.3[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象