检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曹勇[1] CAO Yong(Shuozhou Road and Bridge Construction Co.,LTD.,Shuozhou 036000,China)
机构地区:[1]朔州路桥建设有限责任公司,山西朔州036000
出 处:《四川建材》2020年第4期80-81,共2页Sichuan Building Materials
摘 要:在预应力连续梁施工中难免会出现一些误差,所以必须进行桥梁施工监测与控制。而施工监控贯穿于桥梁施工的始末,是预应力连续梁的核心施工技术。本文阐述了施工监控内容,分析了施工监控主要影响要素,并重点研究了施工监控关键技术要点。some errors are inevitable in the construction ofprestressed continuous beam,so the bridge construction monitoring and control must be carried out.The construction monitoring runs through the beginning and end of bridge construction,which is the core construction technology of prestressed continuous beam.This paper expounds the content of construction monitoring,analyzes the main influencing factors of construction monitoring,and focuses on the key technical points of construction monitoring.
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28