检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林君 程慕祺 王登科 LIN Jun;CHENG Muqi;WANG Dengke(Guangdong Jindong Construction Engineering Co.,Ltd.,Guangzhou 510060,China)
出 处:《路基工程》2020年第2期191-195,共5页Subgrade Engineering
摘 要:依托珠海市某中学后山边坡崩塌防治工程,对岩体加固的预应力钢丝绳的应力应变进行了监测分析。通过对4个典型的危岩体钢丝绳应力的监控,得出钢丝绳的受力随危岩体逐层破解过程中的变化规律,分析了锚拉钢丝绳在危岩体逐层破解过程中的工作状态,确保施工过程中危岩体处于稳定状态,清除了施工过程中的安全隐患。Relying on the prevention project for slope collapse of a secondary school in Zhuhai, the stress strain of prestressed steel wire rope strengthened by rock mass is monitored and analyzed. By selecting four typical dangerous rock masses to monitoring of wire rope stress, the variation rule of wire rope stress in the cracking process of dangerous rock mass layer by layer is obtained and the working state of anchor wire rope in the cracking process of dangerous rock mass layer by layer is analyzed. It is of great significance to ensure that the dangerous rock mass is in a stable state during the construction process and eliminate the hidden danger in the construction process.
关 键 词:高陡边坡 危岩体清除 静态爆破 锚拉预应力钢丝绳 应力应变监测
分 类 号:P642.21[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49