田湾核电站项目外方设备供货延迟的索赔管理实践  

Claim Management Practice of Liquidated Damages on Foreign Equipment Delivery Delay of Tianwan 3&4

在线阅读下载全文

作  者:史永蓉 张建新 孙蓉晖 SHI Yong-rong;ZHANG Jian-xin;SUN Rong-hui(Jiangsu Nuclear Power Corporation,Lianyungang,Jiangsu Prov.222042,China)

机构地区:[1]江苏核电有限公司,江苏连云港222042

出  处:《中国核电》2020年第1期87-90,共4页China Nuclear Power

摘  要:田湾核电站3、4号机组外供设备合同中,外方负责核岛重要设备供货,主设备能否按期保质供货是工程顺利安装的前提,是项目顺利进行的关键因素。为保证工程进度,确保设备顺利供货,合同中设置了延迟交货违约罚款,并通过索赔机制加强管控力度。通过建立索赔数据库、健全索赔台账、搜集索赔证据、梳理索赔难点、建立多部门联动、索赔谈判等策略,成功保证了设备的供货,并在实践中探索出一系列行之有效的合同索赔管理措施。In the contract of Tianwan 3&4,the foreign party is responsible for the supply of important equipment of NI.Delivery on time with good quality is the premise for the installation of the project and the key factor of project progress.In order to ensure the supply of equipment,the contract sets claims for liquidated damages on equipment delivery delay,and strengthens the control through the claim mechanism.By establishing claim database,perfecting claim ledger,collecting claim evidence,sorting out difficulties of claim,establishing multi-department linkage,claim negotiation and other strategies,the equipment supply was successfully guaranteed,and a series of effective measures are found for the contract claim management in practice.

关 键 词:设备延迟供货 索赔条款 索赔管理 索赔台账 

分 类 号:TM623[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象