检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:田振华 Tian Zhenhua(No.1 Cementing Branch of CNPC Bohai Drilling Engineering Co.,Ltd.,Renqiu,Hebei 062552)
机构地区:[1]中国石油集团渤海钻探工程有限公司第一固井分公司,河北任丘062552
出 处:《石化技术》2020年第3期46-46,57,共2页Petrochemical Industry Technology
摘 要:库车山前是塔里木油田增储上产的重点区域,克深9区块作为重要产区,目的层井深全部超过7400m,条件复杂,井深大、环空间隙窄,高温高压、窄安全密度窗口,油气活跃目的层窗口窄,对深层窄间隙小尾管固井工艺技术要求高、风险大。针对以上难点,通过优选水泥浆体系、油基泥浆专用隔离液体系,同时配套成熟的固井工艺,在克深9-1井进行了成功的应用。Kuqa mountain front is the key area of increasing storage and production in Tarim Oilfield.KeS 9 block,as an important production area,has a target well depth of more than 7400m,complex conditions,large well depth,narrow annular space gap,high temperature,high pressure,narrow safety density window,narrow oil and gas active target layer window,which requires high technology and high risk for deep narrow gap and small liner cementing technology.In view of the above difficulties,through the optimization of cement slurry system,oil-based mud special isolation fluid system,and matching with mature cementing technology,it has been successfully applied in well KeS 9-1.
分 类 号:TE256[石油与天然气工程—油气井工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.68