检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邬姝琰 刘姜涛 朱曦 文昊昱 Wu Shuyan;Liu Jiangtao;Zhu Xi;Wen Haoyu(China Petroleum Engineering&Construction Corp.Southwest Company,Sichuan Chengdu 610041)
机构地区:[1]中国石油工程建设有限公司西南分公司,四川成都610041
出 处:《石化技术》2020年第3期117-118,共2页Petrochemical Industry Technology
摘 要:在高温高压埋地集输管道中,直管段的热位移在相邻弯头处部分释放,可能引起弯头应力水平增高。当清管或内检测工况下清管器通过弯头处时,由于存在管道与弯管连接处内径突变和弯头引起清管器运动方向改变等问题,将引起瞬时附加荷载,这可能对导致弯管应力水平进一步升高,因此有必要探讨该部分荷载的计算分析方法。As the natural gas gathering and transportation project tends to develop at high temperature and high pressure,the gathering pipeline downstream of the single well station is faced with the problem of high temperature and pressure in the medium.Controlling the stress level of the pipeline system is one of the key technologies for the design of the gathering pipeline in the future.In the high-temperature and high-pressure buried pipelines,the thermal displacement of the straight pipe section is partially released at the adjacent elbow,which may cause the elbow stress level to increase.When pigs pass through the elbow at the time of pigging or internal inspection,due to the sudden change of the inner diameter of the connection between the pipe and the elbow and the change of the direction of movement of the pig caused by the elbow,transient additional loads will be caused.
分 类 号:TE866[石油与天然气工程—油气储运工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222