检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢洪林 喻建清 XIE Hong-lin;YU Jian-qing(Huaneng Lancang River Hydropower Co.,Ltd.,Kunming,650214,China;Power China Kunming Engineering Corporation Limited,Kunming 650051,China)
机构地区:[1]华能澜沧江水电股份有限公司,云南昆明650214 [2]中国电建集团昆明勘测设计研究院有限公司,云南昆明650051
出 处:《云南水力发电》2020年第2期171-175,共5页Yunnan Water Power
摘 要:介绍了小湾水电站分期蓄水工作的组织与实施,对蓄水期拱坝坝基坝体变形及应力应变、坝基渗流等安全监测成果进行了分析评述,分析结果对了解拱坝整体工作性态及指导后续蓄水工作具有重要意义。The organization and implementation of stage water storage for Xiaowan Hydropower Station are introduced.The results of safety monitoring such as deformation,stress,strain of dam body and seepage of arch dam foundation during water storage period are analyzed and commented.The analysis results are of great significance for understanding the overall working behavior of arch dam and guiding subsequent water storage work.
分 类 号:TV697.1[水利工程—水利水电工程] TV698.1
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.26