作 者:马力 回新冬 姚强岭[2,3] MA Li;HUI Xin-dong;YAO Qiang-ling(Group of Coal and Electricity in North Anhui,Suzhou 234000,China;State Key Laboratory Coal of Coal Resources and Safe Mining,China University of Mining and Technology,Xuzhou 221116,China;School of Mines,China University of Mining and Technology,Xuzhou 221116,China)
机构地区:[1]皖北煤电集团,安徽宿州234000 [2]中国矿业大学煤炭资源与安全开采国家重点实验室,江苏徐州221116 [3]中国矿业大学矿业工程学院,江苏徐州221116
出 处:《煤炭工程》2020年第3期48-52,共5页Coal Engineering
摘 要:为了解决恒源煤矿Ⅱ63采区轨道下山(下段)作业效率慢、打眼装岩耗时时间长、采掘接替紧张等问题,采用中深孔光面爆破技术和CMJ2-18型液压掘进台车与ZWY-150/55L型挖掘式装载机配套机械化作业线,形成钻眼、装岩、运输一体化快速掘进作业模式。结果表明:打眼工效提升4~5倍,转运矸石效率提升一倍,每日单进逐步提升至4.7m,作业工效由0.135m/工增加为0.163m/工,作业效率大幅提升,并且施工环境显著改善,工人劳动强度降低,为岩巷机械化作业线的优化与改进以及现场劳动组织情况的管理提供了一定的依据与借鉴。Aiming at the low operation efficiency,long time for drilling and rock loading,and tension in mining-excavation succession in track dip roadway(lower section)inⅡ63 mining area of Hengyuan Coal Mine,the medium-length hole smooth blasting technology and CMJ2-18 hydraulic tunneling trolley and ZWY-150/55 L excavator loader are adopted to form an integrated rapid tunneling operation mode of drilling,rock loading and transportation.The results show that the drilling efficiency is increased by 4~5 times,the efficiency of waste rock transporting is doubled,the daily single entry is gradually increased to 4.7 m,and the working efficiency is increased from 0.135 m to 0.163 m per worker.The work efficiency is greatly improved,the construction environment is significantly improved,and the labor intensity of workers is reduced,which provides a certain basis and reference for the optimization and improvement of mechanized work lines in rock roadways and the management of on-site labor organization.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28