检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:柴治国 汪作凡 CHAI Zhi-guo;WANG Zuo-fan(CCCC-FHDI Engineering Co.Ltd.,Guangzhou 510230,China)
机构地区:[1]中交第四航务工程勘察设计院有限公司,广州510230
出 处:《工程建设与设计》2020年第7期98-99,106,共3页Construction & Design for Engineering
摘 要:结合巴基斯坦瓜达尔自由区起步区项目的工程实践,针对发电机组的容量选择、并机设计、差动保护整定计算等几个方面,讨论在水运港口项目中高压柴油发电机组的可行性,进而推广高压柴油发电机组在水运港口项目的应用,使水运港口等电力基础设施匮乏、区域电网不完善的问题得以解决。Based on the engineering practice of the project in the starting area of Gwadar free zone in Pakistan, the feasibility of the high-pressure diesel generator set in the water transport port project is discussed in terms of the capacity selection, parallel design,differential protection setting calculation and other aspects of the generator set. Furthermore, the application of high-pressure diesel generator set in the water port project is promoted, so that the problems of lack of power infrastructure such as water port and imperfect regional power grid can be solved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.198