检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:于旭永 YU Xu-yong(Survey and Design Institute(Group)Co.Ltd.,Shihezi 832000,China)
机构地区:[1]新疆兵团勘测设计院(集团)有限责任公司,新疆石河子832000
出 处:《工程建设与设计》2020年第7期143-145,共3页Construction & Design for Engineering
摘 要:对拟除险加固的巴音沟河渠首引水枢纽开展水工模型冲刷试验。试验结果表明:设计洪水时(流量322m3/s)内库上坝(坝顶高程876.2m)坝前水面高程875.7m,较坝顶低0.5m,在校核洪水时,坝前水面高于坝顶出现漫溢,建议加高内库上坝高度;2种工况下冲刷坑基本趋于稳定。The scour test of hydraulic model is carried out for the diversion project of bayingou river head to be reinforced. The test results show that the elevation of the water surface in front of the dam is 875.7 m, which is 0.5 m lower than the dam crest during the design flood(flow of 322 m3/s). During the check flood, the water surface in front of the dam is higher than the dam crest, so it is suggested to increase the height of the upper dam of the internal reservoir. Under the two conditions, the foundation of the scour pit tends to be stable.
分 类 号:TV66[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7