巴音沟河渠首泄洪闸冲刷模型试验研究  被引量:4

Experimental Study on Owerflow Capacity of Spillway Sluice at the Headwork of Bayingou River

在线阅读下载全文

作  者:于旭永 YU Xu-yong(Survey and Design Institute(Group)Co.Ltd.,Shihezi 832000,China)

机构地区:[1]新疆兵团勘测设计院(集团)有限责任公司,新疆石河子832000

出  处:《工程建设与设计》2020年第7期143-145,共3页Construction & Design for Engineering

摘  要:对拟除险加固的巴音沟河渠首引水枢纽开展水工模型冲刷试验。试验结果表明:设计洪水时(流量322m3/s)内库上坝(坝顶高程876.2m)坝前水面高程875.7m,较坝顶低0.5m,在校核洪水时,坝前水面高于坝顶出现漫溢,建议加高内库上坝高度;2种工况下冲刷坑基本趋于稳定。The scour test of hydraulic model is carried out for the diversion project of bayingou river head to be reinforced. The test results show that the elevation of the water surface in front of the dam is 875.7 m, which is 0.5 m lower than the dam crest during the design flood(flow of 322 m3/s). During the check flood, the water surface in front of the dam is higher than the dam crest, so it is suggested to increase the height of the upper dam of the internal reservoir. Under the two conditions, the foundation of the scour pit tends to be stable.

关 键 词:巴音沟河 渠首 泄洪闸 冲刷 

分 类 号:TV66[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象