检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邓永红 DENG Yonghong(Guangzhou Institute of China Railway Siyuan Survey&Design Group Co.Ltd.,Guangzhou 510060,China)
机构地区:[1]中铁四院集团广州设计院有限公司,广州510600
出 处:《铁道建筑》2020年第3期47-49,共3页Railway Engineering
摘 要:长沙市新建旺东物流园周边临近既有铁路,须在石门至长沙铁路北西联络线隧道上填土堆载,并临近隧道进行桥梁桩基施工,对既有铁路隧道造成较大影响。本文通过对铁路隧道的模拟分析进行强度、裂缝、位移等多项指标检算验证,同时提出一系列工程应对措施,以确保铁路隧道安全和列车运行安全。Since the new-build Wangdong logistics park is near the existing railway,filling and loading must be operated on the connective tunnel between the north and the south part of Shimen-Changsha railway,and bridge pile foundations need to be constructed near the tunnel.This will cause a great impact on the existent railway tunnel.This paper will demonstrate various indices regarding strength,cracking and displacement of the railway tunnel,verify them and come up with a series of effective countermeasures in order to ensure the safety and security of railway tunnel and train operation.
分 类 号:U215.8[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222