检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:秦飞[1,3] 金燕林[2,3] QIN Fei;JIN Yanlin(Research Institute of Petroleum Engineering Technology,Sinopec Northwest Oilfield Company,Urumqi,Xinjiang 830011,China;Research Institute of Exploration and Development,Sinopec Northwest Oilfield Company,Urumqi,Xinjiang 830011,China;Key Laboratory for EOR of Carbonate Fractured-Vuggy Reservoir of Sinopec,Urumqi,Xinjiang 830011,China)
机构地区:[1]中国石化西北油田分公司石油工程技术研究院,新疆乌鲁木齐830011 [2]中国石化西北油田分公司勘探开发研究院,新疆乌鲁木齐830011 [3]中国石化缝洞型油藏提高采收率重点实验室,新疆乌鲁木齐830011
出 处:《油气藏评价与开发》2020年第2期101-106,共6页Petroleum Reservoir Evaluation and Development
基 金:“十三五”国家科技重大专项“塔里木盆地碳酸盐岩油气田提高采收率关键技术示范工程”(2016ZX05053)。
摘 要:塔河油田YT1断块经过长时间衰竭开采,加之底水锥进,气井已普遍进入高含水阶段,气举、排水采气等常规措施不同程度失效,堵水成为后期主要接替措施。结合塔河堵水经验,以相渗调整剂作为主要研发方向,形成了以塔河中质稀油、“阴离子+非离子”复配乳化体系为主体的乳化油堵剂,地层条件下黏度达到50~60 mPa·s,对储层低伤害。通过单、双填砂管驱替实验发现,乳化油体系水相封堵率83.4%、油相封堵率仅仅在11.9%,具有较好的耐冲刷性、油水相态选择性和地层渗透率调整能力。乳化油堵水工艺段塞设计为“稀油隔离液+乳化油体系+稀油隔离液+清水顶替液”,不动管柱,焖井1~2 d,可实施1~2轮次。现场乳化油堵水效果较好,对同类凝析油气藏堵水有重要的指导作用。After a long time of depletion production and bottom water coning,the YT1 Fault Block in Tahe Oilfield has generally entered the high water cut stage.Conventional measures such as gas lifting,drainage and gas production have failed in some case,and water plugging has become the main replacement in the later stage.Based on the water plugging experience of Tahe Oilfield,the relative permeability adjusting agent is took as the main research and development direction,and forms the emulsified oil plugging agent is formed based on the medium dilute oil and the“anion+non-ion”compound emulsified system of Tahe Oilfield.Under the formation condition,the viscosity reaches 50~60 mPa·s,causing low damage to the reservoir.Through the single and double sand filling tube displacement experiments,it is found that the water-phase plugging rate of the emulsified oil system is 83.4%,and that for oil-phase is only 11.9%.Therefore,it has better erosion resistance,oil-water phase selectivity and formation permeability adjustment ability.The slug of water plugging process by emulsified oil is designed as"dilute oil acted as isolation fluid+emulsified oil system+dilute oil acted as isolation fluid+clear water displacement fluid",without moving the string,and with 1~2 days’soaking,to implement 1~2 rounds.The field application has a good water plugging effect,providing an important guiding for the similar condensate oil and gas reservoirs in water plugging.
分 类 号:TE372[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143