检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵雯 邢会歌[1] 李玉瑶 ZHAO Wen;XING Hui-ge;LI Yu-yao(College of Architecture&Environment,Sichuan University,Chengdu 610065,China)
出 处:《价值工程》2020年第10期60-62,共3页Value Engineering
摘 要:公租房PPP项目的投资风险因素存在模糊性和冗余性,用粗集动态约简风险指标可消除指标间的关联性,构建基于民营部门投资风险的评价指标体系;将G1法应用于UEOWA-ULHA算子进行权重计算,把专家基于语言评估标度做出的风险评价结果用决策矩阵表示,通过可能度公式计算得出可能度矩阵,最后求得排序向量,得到最优投资项目,在民营部门选取的项目中运用可能度矩阵排序得到关键风险因素,为民营部门的投资决策提供参考,也为民营部门提供了提前制定关键风险因素应对措施的指导。Aiming at the fuzziness and redundancy of the investment risk factors of the private sector in PPP projects of public rental housing,this paper uses the rough set dynamic reduction risk index to eliminate the correlation among the indicators,and constructs the evaluation index system based on the investment risk of the private sector.Then the G1 method was applied to UEOWA-ULHA operator,overcomes the drawback of AHP need consistency check,the experts based on the linguistic evaluation scale to make risk assessment results with that decision matrix,calculated by possible degree formula may degree matrix,finally obtained by sorting vectors,get the optimal investment projects,use in the private sector to select projects could degree matrix sorting key risk factors,provide a reference for private sector investment decision,also for the private sector to provide the key risk factors of countermeasures develop guidance in advance.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.61