200m^2烧结机更换头部星轮施工方案改进  

Improvement on the Construction Scheme of Replacing the Head Starwheel of 200 m^2 Sintering Machine

在线阅读下载全文

作  者:王鹏 薛彦军[1] 许瑞 Wang Peng;Xue Yanjun;Xu Rui(Shougang Changzhi Iron&Steel Co.,Ltd.,Changzhi Shanxi 046031)

机构地区:[1]首钢长治钢铁有限公司,山西长治046031

出  处:《山西冶金》2020年第1期70-72,共3页Shanxi Metallurgy

摘  要:头部星轮是烧结机的关键设备,星轮的安装精度是影响烧结机台车跑偏、啃轨和叠靠的关键因素,通过对头部星轮施工方案改进的研究、探索和实施,简化了吊装及施工流程,既保证了星轮的安装精度,又缩短了施工时间,同时降低了劳动强度,改善了星轮向西跑偏等问题。The head starwheel is the key equipment of the sintering machine,and the installation accuracy of the starwheel is the key factor affecting the deviation,rail gnawing and stacking of the sintering machine trolley.Through the research,exploration and implementation of the improvement of the construction scheme of the head starwheel,the hoisting and construction process is simplified,which not only ensures the installation accuracy of the starwheel,but also shortens the construction time,reduces the labor intensity and improves the west deviation of starwheel,etc.

关 键 词:星轮安装 台车跑偏 柔传安装 弯轨 

分 类 号:TH112.4[机械工程—机械设计及理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象