高层建筑采用CFG复合地基和短管桩的应用对比  

Comparison of CFG composite foundation and short tube piles in high-rise buildings

在线阅读下载全文

作  者:丁小伟 Ding Xiaowei(China Coal Xi’an Design Engineering Co.,Ltd.,Xi’an 710054,China)

机构地区:[1]中煤西安设计工程有限责任公司,陕西西安710054

出  处:《山西建筑》2020年第9期69-71,共3页Shanxi Architecture

摘  要:介绍了西安地区两栋相同的高层建筑,分别采用CFG短桩复合地基和高强预应力短管桩的应用实例,总结了两种地基方案的工艺特点、载荷试验结果,并结合结构封顶后两年期间的沉降观测数据分析,证明两种方案可行并且是成功的,同时通过对成本和工期的对比,为类似工程地基方案的优选提供了参考经验。In this paper two application examples of identical high-rise buildings in Xi’an are introduced,CFG composite founda-tion and high-strength prestressed short tube piles are applied as foundation.The process characteristics and load test results of thetwo foundation schemes are summarized.The analysis of the settlement observation data during the first two years after the structurecapping proves that the two schemes are feasible and successful.At the same time,the comparison of cost and construction periodprovides reference experience for the optimization of similar foundation projects.

关 键 词:高层建筑 CFG短桩复合地基 PHC短管桩 沉降观测 

分 类 号:TU470[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象