柱纵筋连接方式变更的结算过程剖析  

Analysis on the settlement process of the change of column longitudinal bar connection mode

在线阅读下载全文

作  者:张瑞娟 陈映棠 Zhang Ruijuan;Chen Yingtang(Shanxi Zhushi Architectural Design Co.,Ltd.,Taiyuan 030001,China;Shanxi Academy of Building Research Co.,Ltd.,Taiyuan 030001,China)

机构地区:[1]山西柱石建筑设计有限公司,山西太原030001 [2]山西省建筑科学研究院有限公司,山西太原030001

出  处:《山西建筑》2020年第9期151-153,共3页Shanxi Architecture

摘  要:通过结算新疆某项目中的某单位工程的变更签证单14HJ-U7-TJ-035,给出了计算变更签证的审核程序和处理流程,纠正了施工方错误的梁纵筋接头计算方法,明确了柱的定义,给出了柱和剪力墙边缘构件(端柱、有翼墙、转角墙)的区别,对今后土建结算中,梁、柱纵筋连接接头工程量的准确结算提供参考依据。This paper presents the checking procedure and processing flow of the change visa form 14 HJ-U7-TJ-035 for the coalpreparation plant of the Xintian coal-to-natural gas project in Ili Kazakh Autonomous Prefecture,and corrects the incorrect calcula-tion method of the beam longitudinal bar joint,the definition of column is clarified,and the difference between column and shearwall edge members(end column,wing wall,corner wall) is given.

关 键 词:电渣压力焊 机械连接 设计变更 工程造价 

分 类 号:TU723.31[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象