检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:江蕾[1] JIANG Lei(Hainan Earthquake Agency, Haikou 570203, Hainan, China)
机构地区:[1]海南省地震局,海南海口570203
出 处:《地震工程学报》2020年第2期517-520,共4页China Earthquake Engineering Journal
摘 要:为了避免福岭采石场爆破施工对周边民房的影响,布设4个测试点,对不同药量及距离产生的爆破振动给附近民房带来的影响进行监测和分析,得到了振动衰减关系及该采石场爆破施工对附近民房影响的安全距离。当保护对象距离为200 m时,96 kg药量,振动速度为0.45 cm/s,达到土坯房和毛石房屋容许振动的上限值。To avoid the impact of the blasting construction in Fuling quarry on the surrounding residential houses,a total of four test points were set up,and the influence of blasting vibration with different blasting charges and distances on nearby houses was monitored and analyzed.The vibration attenuation relationship and the safe distance of the quarry blasting construction for nearby residential houses were obtained.When the distance from the protected objects is 200 m,the blasting charge is 96 kg,and the vibration velocity is 0.45 cm/s,the upper limit value of the allowable vibration of the adobe house and rubble house is reached.
关 键 词:爆破振动 影响范围 评估方法 衰减关系 民房 采石场
分 类 号:TU235[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.15.53.236