检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杜跃亭 王志祥 DU Yueting;WANG Zhixiang(Zhejiang Institute of Water Resources and Estuary,Hangzhou 310020,China;Zhejiang Guangchuan Engineering Consulting Co.,Ltd.,Hangzhou 310020,China)
机构地区:[1]浙江省水利河口研究院,浙江杭州310020 [2]浙江广川工程咨询有限公司,浙江杭州310020
出 处:《水利建设与管理》2020年第4期27-32,共6页Water Conservancy Construction and Management
摘 要:本文在景宁县金村水库“L”形侧槽溢洪道设计方案模型试验初步研究的基础上,针对原设计方案存在的问题进行改进优化,通过FLOW-3D进行数值模拟方案比选,并确定推荐方案。后期再依据此推荐方案进行模型试验,对其水力特性进行深入研究分析,并最终确定其结构布置、掺气减蚀设施和消能形式,为工程实施提供理论依据。The preliminary research is carried out on the“L”-shaped side-slotted spillway design scheme of Jincun Reservoir in Jingning County was carried out,the existing problems of the original design scheme were improved and optimized through the model test in the early stage of this paper.The problems in the former design plan are improved and optimized.The numerical simulation scheme is compared and selected through FLOW-3D,and the recommended scheme is determined.Model test is implemented according to the recommended plan accordingly in the later stage.In-depth study and analysis are carried out on its hydraulic characteristics.The structure layout,cavitation erosion reduction facilities and energy dissipation type are finally determined,thereby providing theoretical basis for project implementation.
关 键 词:“L”形侧槽溢洪道 模型试验 数值分析 优化方案
分 类 号:TV322[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.89.16