后浇带充气式软管侧模安装施工技术的探讨  

Discussion on the Installation and Construction Technology of the Side Formwork of the Inflatable Hose of the Post Cast Strip

在线阅读下载全文

作  者:郭佳清 Guo Jiaqing(The 8th Engineering Bureau Co.Ltd.,of Zhongcheng Investment Group,Xiamen,Fujian 362000)

机构地区:[1]中城投集团第八工程局有限公司,福建厦门362000

出  处:《江西建材》2020年第4期118-119,共2页Jiangxi Building Materials

摘  要:对后浇带充气式软管侧模安装施工进行了探讨,详细阐述了采用充气式聚酯纤维加强网+PVC涂层软管作为侧模的支撑来代替传统钢丝网、木模等的施工方法。This paper discusses the installation and construction of the side formwork of the inflatable hose with the post pouring belt,and expounds in detail the construction method of using the inflatable polyester fiber reinforced mesh+PVC coated hose as the support of the side formwork to replace the traditional steel wire mesh,wood formwork,etc.

关 键 词:后浇带 侧模支设技术 充气式聚酯纤维加强网+PVC涂层软管 

分 类 号:TU755[建筑科学—建筑技术科学]

 