南阳坡矿综放顶煤放出率及工艺优化研究  被引量:2

Study on the Caving Rate and Process Optimization of the Fully Mechanized Top Coal Caving in Nanyangpo Mine

在线阅读下载全文

作  者:刘健 Liu Jian(Fully Mechanized Mining Office of Datong Coal Mining Group,Shanxi Datong 037000)

机构地区:[1]大同煤矿集团综采办公室,山西大同037000

出  处:《山东煤炭科技》2020年第4期14-16,19,共4页Shandong Coal Science and Technology

摘  要:针对南阳坡矿综放工作面顶煤放出率较低问题,分别研究了不同放煤步距和放煤顺序时工作面顶煤运移规律及顶煤放出率,确定采用两刀一放配合间隔放煤的最优工艺。研究表明,间隔放煤较顺序放煤时工作面支架整体放煤量较高,优化后提高顶煤放出率。In view of the low top coal caving rate in Nanyangpo Coal Mine,the paper studies the top coal movement rule and top coal caving rate in different caving steps and sequences,and determines the optimal technology of two knives and one caving with interval caving.The results show that the amount of coal released from the support of the working face is higher than that of the sequential coal release,and the top coal release rate is increased after optimization.

关 键 词:综放 放出率 步距 顺序 

分 类 号:TD823.49[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象