采用石硫合剂处理某难浸金矿的试验研究  被引量:6

Experimental Research on Treatment of A Refractory Gold Ore by Lime Sulphur

在线阅读下载全文

作  者:张景河 ZHANG Jinghe(Xinjiang Jinchuan Mining Co.,Ltd.Yili Prefecture,Xinjiang 835100,China)

机构地区:[1]新疆金川矿业有限公司,新疆伊犁州835000

出  处:《矿业研究与开发》2020年第4期118-121,共4页Mining Research and Development

摘  要:新疆某地的蚀变凝灰岩型金矿石中主要载金矿物是臭葱石、黄铁矿和毒砂,金呈微细粒包裹于其中,同时矿石"泥化"严重并含少量有机碳,常规氰化金的浸出率在40.95%,属于难浸矿石。为了提高金的浸出率,采用预处理后氰化获得了93.89%的浸出率,同时探讨了采用石硫合剂浸出该矿石,并获得了93.51%的浸出率指标。The main gold-bearing minerals in altered tuff-type gold ore in Xinjiang were allium,pyrite and arsenopyrite,in which gold was wrapped as fine grains,while the ore was"muddy"and contains a small amount of organic carbon.The leaching rate of conventional cyanide gold was 40.95%,which belonged to refractory ore.The leaching rate of 93.89% was obtained by cyanidation after pretreatment.At the same time,the leaching rate of the ore by lime sulphur was studied experimentally,and the leaching rate index of 93.51% was obtained.

关 键 词:石硫合剂 预处理 金矿 浸出 

分 类 号:TD853.37[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象