地下人行通道和出入口工程概算突破估算原因分析  被引量:2

Analysis of Reasons for Budget Exceeding Estimate in Underground Pedestrian Passage and Entrance and Exit Engineering

在线阅读下载全文

作  者:张星海 ZHANG Xing-hai(Foshan Rail Transit Design and Research Institute Co.,Ltd.,Foshan 528300,China)

机构地区:[1]佛山轨道交通设计研究院有限公司,佛山528300

出  处:《价值工程》2020年第11期117-119,共3页Value Engineering

摘  要:随着经济和社会发展,我国地铁建设已进入快速发展阶段,人民对于与地铁相连通的出入口和人行通道的需求也越来越多。本文针对地下人行通道和出入口工程造价编制过程中出现的概算超投资估算的问题,通过某城市地下人行通道和出入口工程案例的分析,找出其概算指标与估算指标水平的差异,并找出原因所在和提出投资估算编制几点建议。With the economic and social development, China’s subway construction has entered a stage of rapid development, and the people’s demand for entrances and pedestrian passages connected to the subway is also increasing. This paper aims at the problem of budget exceeding investment estimation in the process of compiling underground pedestrian passages and entrances and exits. Through the analysis of the cases of underground pedestrian passages and entrances and exits in a city, the differences between the budget and estimated indexes are found and the reasons are found. A few suggestions for the preparation of investment estimates are proposed.

关 键 词:工程造价 地下通道 估算指标 概算指标 

分 类 号:TU723.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象