检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:侯亚平 HOU Yaping(Shanxi Jincheng Xing Tang Coal Industry Co.,Ltd.,Shanxi Jincheng 048000)
机构地区:[1]山西晋城兴唐煤业有限公司,山西晋城048000
出 处:《煤矿现代化》2020年第3期80-82,85,共4页Coal Mine Modernization
摘 要:为了保证车寨矿井首采区的安全建设及采掘,需对首采区内的构造进行控制。现采用三维地震勘探勘探技术对该矿井的首采区5.106km2范围内进行地面勘探工作。在确定激发条件等施工参数后进行勘探作业,发现勘探区地层总体为一走向近NE,倾向NW,倾角2~12o的单斜构造,在此基础上发育次一级小褶曲3条;断层26条,长轴直径大于25m的陷落柱24个。此次勘探结果一定程度上保证了首采区巷道掘进及工作面回采等安全作业。In order to ensure the safe construction and mining of the first mining area of the Chezhai Mine, it is necessary to control the structure in the first mining area. The 3 D seismic exploration and exploration technology is used to conduct ground exploration work in the area of5.106 km2 in the first mining area of the mine. After determining the construction parameters such as the excitation conditions, the exploration operation is carried out. It is found that the strata in the exploration area are generally a single-inclined structure with a trend of near NE, a tendency of NW and a dip angle of 2 to 12°. On this basis, three sub-scale folds are developed;fault 26 Bars, 24 trap columns with a major axis diameter greater than 25 m. The results of this exploration have ensured safe operation such as roadway excavation and working face mining in the first mining area.
分 类 号:P631.4[天文地球—地质矿产勘探] TD325.3[天文地球—地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.44