煤矿底抽巷施工中综掘技术的应用研究  被引量:1

Study on Application of Fully-mechanized Excavation Technology in Coal Mine Bottom-drawing Construction

在线阅读下载全文

作  者:朱立新 Zhu Lixin(Wuyang Coal Mine,Lu'an Mining Group Co.,Ltd.,Changzhi Shanxi 046205)

机构地区:[1]山西省潞安矿业集团有限责任公司五阳煤矿,山西长治046205

出  处:《机械管理开发》2020年第4期234-235,共2页Mechanical Management and Development

摘  要:研究了综掘技术在煤矿底抽巷施工中的应用.介绍了应用综掘技术时应进行的主要准备工作,分析了煤矿底抽巷施工作业中应用综掘技术的具体方法,总结了煤矿底抽巷施工中应用综掘技术的主要注意事项,以期有助于进一步提高煤矿底抽巷施工的质量与效率.The application of fully mechanized excavation technology in the construction of coal mine bottom drawing roadway is studied. This paper introduces the main preparation work which should be carried out when applying fully mechanized excavation technology, analyzes the concrete method of applying fully mechanized excavation technology in coal mine bottom drawing roadway construction, summarizes the main matters needing attention in applying fully mechanized excavation technology in coal mine bottom drawing roadway construction, in order to further improve the quality and efficiency of coal mine bottom drawing roadway construction.

关 键 词:底抽巷 综掘技术 准备工作 应用方法 注意事项 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象