黄河青海段中型水电站枢纽布置及技术发展  

Layout and Technical Development of Medium-Sized Hydropower Stations in The Qinghai Section of The Yellow River

在线阅读下载全文

作  者:吴峻峰[1] 焦健[1] 孙海涛 WU Junfeng;JIAO Jian;SUN Haitao(PowerChina Northwest Engineering Corporation Limited, Xi'an 710065,China)

机构地区:[1]中国电建集团西北勘测设计研究院有限公司,西安710065

出  处:《西北水电》2020年第2期1-5,共5页Northwest Hydropower

摘  要:黄河青海段梯级中型水电站是黄河上游水电基地重要组成部分,文章回顾了梯级中型水电站开发历程,叙述了主要工程技术条件、工程布置论证要点、枢纽布置特点,总结枢纽建筑物创新性成果研究及应用、技术发展、借鉴和传承。The cascade medium-sized hydropower stations in the Qinghai section of the Yellow River constitute an important part of the hydropower base in the upper reaches of the Yellow River.The article reviews the development history of the cascade medium-sized hydropower stations on the Yellow River,narrates on the key technical conditions,key points for layout review,layout characteristics and summarizes the study and application,technological development,reference and inheritance of the innovative achievements.

关 键 词:中型水电站 枢纽布置 第三系黏土岩 贯流式机组 尾水河道 

分 类 号:TV742[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象