检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴峻峰[1] 焦健[1] 孙海涛 WU Junfeng;JIAO Jian;SUN Haitao(PowerChina Northwest Engineering Corporation Limited, Xi'an 710065,China)
机构地区:[1]中国电建集团西北勘测设计研究院有限公司,西安710065
出 处:《西北水电》2020年第2期1-5,共5页Northwest Hydropower
摘 要:黄河青海段梯级中型水电站是黄河上游水电基地重要组成部分,文章回顾了梯级中型水电站开发历程,叙述了主要工程技术条件、工程布置论证要点、枢纽布置特点,总结枢纽建筑物创新性成果研究及应用、技术发展、借鉴和传承。The cascade medium-sized hydropower stations in the Qinghai section of the Yellow River constitute an important part of the hydropower base in the upper reaches of the Yellow River.The article reviews the development history of the cascade medium-sized hydropower stations on the Yellow River,narrates on the key technical conditions,key points for layout review,layout characteristics and summarizes the study and application,technological development,reference and inheritance of the innovative achievements.
关 键 词:中型水电站 枢纽布置 第三系黏土岩 贯流式机组 尾水河道
分 类 号:TV742[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.19