检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:叶钒臣 Fanchen Ye(China Construction Eighth Engineering Bureau Co.,Ltd.,Hangzhou,Zhejiang,310000,China)
机构地区:[1]中国建筑第八工程局有限公司,中国·浙江杭州310000
出 处:《工程技术研究(百科)》2020年第1期76-77,共2页Engineering technology research
摘 要:在建筑工程项目施工过程中,电气安装往往会在预留预埋过程中出现问题。为了有效地解决建筑电力安装项目质量问题,相关技术人员需要实行预留预埋施工对策,有效提升建筑工程项目的整体质量。文章主要研究了建筑电气管道预留预埋施工工艺。In the construction process of construction project,electrical installation often has problems in the process of reserving and burying.In order to effectively solve the quality problem of construction electric power installation project,the relevant technical personnel need to carry out reserved pre-buried construction countermeasures to effectively improve the overall quality of construction project.This paper mainly studies the construction technology of reserved pre-burying of building electrical pipeline.
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49