检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:田辉[1] 母晓红 高伟[1] Hui Tian;Xiaohong Mu;Wei Gao(CCCC-FHDI Engineering Co.,Ltd.,Guangzhou,Guangdong,510230,China;Zhonghua Quanzhou Petrochemical Co.,Ltd.,Quanzhou,Fujian,362103,China)
机构地区:[1]中交第四航务工程勘察设计院有限公司,中国·广东广州510230 [2]中化泉州石化有限公司,中国·福建泉州362103
出 处:《工程技术研究(百科)》2020年第1期130-133,共4页Engineering technology research
摘 要:为了消化工程量变化和价格波动带来的风险,EPC总承包商往往会将一定的风险费包含在投标报价中,这就势必导致中标价较高。如何在充分发挥EPC总承包设计与管理优势的基础上,实现建设投资总额的进一步减少,真正做到提质增效,是人们在进行项目合同管理过程中值得深入研究的课题。In order to digest the risks brought by engineering quantity changes and price fluctuations,EPC general contractors often include certain risk fees in the bid price,which will inevitably lead to higher bid price.How to give full play to EPC general contracting design and on the basis of management advantages,realizing the further reduction of total construction investment and truly improving quality and efficiency is a topic worthy of in-depth study in the process of project contract management.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7