检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘余红 Yuhong Liu(China Railway Fifth Survey and Design Institute Group Co.,Ltd.,Beijing,102600,China)
机构地区:[1]中铁第五勘察设计院集团有限公司,中国·北京102600
出 处:《工程技术研究(百科)》2020年第2期18-19,共2页Engineering technology research
摘 要:为最大限度地减少工程成本,提高工程投资效益,必须重视定额编制工作。首先需明确定额编制的内容及原则,并积极寻找定额编制的有效策略,把项目的实际情况与编制工作相融合,并落实到定额编工作中,确保定额的准确性及可行性,为有效控制建筑工程的成本奠定基础。In order to minimize the project cost and improve the efficiency of project investment,we must pay attention to the quota compilation work.First of all,it is necessary to make clear the contents and principles of quota compilation,and actively find out the effective strategy of quota compilation,integrate the actual situation of the project with the compilation work,and implement it into the quota compilation work to ensure the accuracy and feasibility of the quota,so as to lay the foundation for the effective control of the cost of the construction project.
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.224