检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:程利振 CHENG Lizhen(Tongling Nonferrous Metals Group Holdings Co.,Ltd.,Tongling,Anhui,244100,China)
机构地区:[1]铜陵有色金冠铜业分公司,安徽铜陵244100
出 处:《有色冶金设计与研究》2020年第2期18-20,23,共4页Nonferrous Metals Engineering & Research
摘 要:详细介绍了铜陵有色新建顶吹炉项目熔炼主工艺的工艺流程,以及配料、制粒、熔炼、水淬的4个工序的工艺特点。针对新建顶吹炉试生产过程中出现的问题,提出了相应的改进方法,有效稳定了顶吹炉渣型、冰铜品位和冶炼温度。该项目自2018年5月18日开始投料试生产以来,运行情况良好,且质量好、投资省、达产快,安全环保。This paper introduces in detail the main smelting process of the new top blowing furnace project of Tongling Nonferrous Metals Co., Ltd., as well as the technological characteristics of the four processes of batching,?pelletizing, smelting and water quenching. In view of the problems in the trial production of the new top blowing furnace, the corresponding improvement methods are put forward, which effectively stabilize the slag type, matte grade and smelting temperature of the top blowing furnace. Since the trial production of the project started on May 18, 2018, it has been running well with good quality, low investment, fast production, safety and environmental protection.
分 类 号:TF811[冶金工程—有色金属冶金]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7