作 者:王宾 Wang bin
机构地区:[1]云南电网有限责任公司昆明供电局,云南昆明650011
出 处:《电力系统装备》2020年第6期108-109,共2页Electric Power System Equipment
摘 要:架空输电线路杆塔工频接地电阻的测量方法采用三极法测量时,须放出两根探针及其连线,连线长度分别为2.5倍和4倍的接地射线长度。目前输电线路杆塔的接地射线最长约60 m,接地摇表测线总长约400 m,所携带的测线经常绞在一起,收放线工作量大,测线放出长度不准确,测量耗时长,测量结果不准确。文中以上述问题为切入点,深入分析导致问题的原因,并思考解决问题的工具及方式方法。Overhead transmission line tower grounding resistance of power frequency measurement method is divided into three pole method is used to measure,and its attachment must be released two probe,wire length,respectively 2.5 times and 4 times of grounding ray length.The transmission line tower grounding rays longest,about 60 meters,ground shaking table's line is about 400 meters,the line is often carried by twisted together,pay-off workload big,line release length is inaccurate and time-consuming measurement,the measurement result is inaccurate and to solve above problems as the breakthrough point,in-depth analysis of the causes of the problem,and think about the tools and methods to solve the problem.
分 类 号:TM76[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.139.83.202