亚洲基础设施投资银行钢结构施工部署  

STEEL STRUCTURE CONSTRUCTION ARRANGEMENT OF ASIAN INFRASTRUCTURE INVESTMENT BANK

在线阅读下载全文

作  者:王艺超 邓强 葛亮 吴小婉 李岩岩 祖建[1] WANG Yi-chao;DENG Qiang;GE Liang;WU Xiao-wan;LI Yan-yan;ZU Jian(Beijing Urban Construction Group Co.,Ltd.,100084,Beijing,China)

机构地区:[1]北京城建集团有限责任公司,北京100084

出  处:《建筑技术》2020年第4期398-401,共4页Architecture Technology

摘  要:亚洲基础设施投资银行B标段钢结构施工中,针对工程量大,场地狭小,工期紧张等难点,通过分析讨论解决了单构件重量大、场地受限造成的构件水平运输问题,根据不同阶段重点协调主次工序交接,合理设置流水段,仅用81d完成了3.9万t钢结构的高难度安装工作.Construction of the steel structure in Asian Infrastructure Investment Bank project bid section B involved large workload,narrow construction site and tight construction schedule.After analysis and discussion,relevant horizontal transportation difficulties due to big weight o f single component and limit site area were overcome.Primary and secondary construction sequences were effectively arranged and construction flow sections were reasonably set,to successfully finish the installation of 390001 steel structure within only 81 d.

关 键 词:钢结构 流水段 施工部署 

分 类 号:TU71[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象