检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张香平 ZHANG Xiangping(Datong Coal Mine Group Wajinwan Coal Co.,Ltd.,Datong,Shanxi 037042,China)
机构地区:[1]大同煤矿集团挖金湾煤业有限责任公司,山西大同037042
出 处:《机电工程技术》2020年第3期55-57,共3页Mechanical & Electrical Engineering Technology
摘 要:为了解决矿井高压电缆故障定位难问题,借鉴智能化WAMS技术,从理论上介绍了WAMS系统双端定位原理和WAMS系统结构组成,仿真模拟了WAMS系统双端定位故障效果。井下应用试验表明WAMS系统双端定位井下高压电缆故障可操作性强、定位精准、响应速度快、修复效率高,WAMS系统双端定位解决了井下电缆故障定位难题,对矿井供电系统具有重要的现实意义。In order to solve the problem of fault location of mine high-voltage cable, the principle of two-terminal location of WAMS system and the structure of WAMS system were introduced theoretically with reference to intelligent WAMS technology, the effect of two terminal fault location in WAMS system was simulated. The application test shows that the downhole high-voltage cable fault location by two-terminal WAMS system has strong operability, accurate positioning, fast response speed and high repair efficiency, the problem of determining the fault of underground cable is solved by the double-terminal positioning,which has important practical significance for the mine power supply system.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.10.73