检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵振军 涂圆圆[1] ZHAO Zhenjun;TU Yuanyuan(China Yangtze Power Co., Ltd., Yichang 443002, China)
机构地区:[1]中国长江电力股份有限公司,湖北宜昌443002
出 处:《水电与新能源》2020年第4期43-47,共5页Hydropower and New Energy
摘 要:基于无浮托引张线的工作原理,分析葛洲坝无浮托引张线自动化监测系统运行监测资料,并与传统人工观测数据以及步进电机式、电容式引张线系统进行对比分析表明,无浮托引张线自动化监测系统自动化程度高、系统运行可靠性高、测值精度高,能更真实反映大坝变形。The application of the non-floating tension wire alignment method in deformation monitoring of Gezhouba Dam is introduced.After an introduction of the working principles of the non-floating tension wire alignment method,the performance of the automatic deformation monitoring system with the non-floating tension wires in Gezhouba Dam is analyzed and compared with the traditional manual observation method,and the stepping motor type and capacitor type tension wire systems.The results show that the automatic deformation monitoring system with non-floating tension wires is of advantages such as high degree of automation,high operation reliability and high accuracy of measurement,which can reflect the deformation of the dam exactly.
分 类 号:TV698.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249