检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林之航[1] LIN Zhihang(Fuzhou Investigation and Surveying Institute,Fuzhou 350001)
机构地区:[1]福州市勘测院,福建福州350001
出 处:《福建建筑》2020年第4期73-77,共5页Fujian Architecture & Construction
摘 要:以紧邻现状建筑的大型软土深基坑支护为案例,探讨了叠合墙基坑明挖顺作法与盖挖逆作法的结合运用的优势、适用条件、关键点,详细剖析了组合运用的复杂工序合理安排、设计施工难点及具体解决对策。实践结果表明,该结合作法对软土深基坑开挖能充分发挥优势,既满足工程安全要求,又缩短工期,但要注重把控实际运用中的若干难点、关键点。Taking the support of a large soft soil deep foundation pit which is adjacent to the existing building as an example,the paper discussed the advantages,applicable conditions and key points of the bottom-up method and cover top-down method in deep foundation pits excavation of composite wall. And the reasonable arrangement of complex working procedure,design and construction difficulties and specific solutions were also analysed. The practice results show that this method can give full play to the advantages of soft soil deep foundation pit excavation,which not only meets the engineering safety requirements,but also shortens the construction period,but some difficulties and key points in practical application should pay more attentions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.63