检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周文彬 徐华 罗武根 宋乐 林森 李甜 ZHOU Wen-bin;XU Hua;LUO Wu-gen;SONG Le;LIN Sen;LI Tian(International Engineering Department 3 of North International Cooperation Co.,Ltd.,100040,Beijing,China)
机构地区:[1]北方国际合作股份有限公司国际工程三部,北京100040
出 处:《建筑技术》2020年第2期209-210,共2页Architecture Technology
摘 要:老挝万象供水管网扩建及智能化升级项目水塔设计施工过程中,根据场地地质报告,结合所在地桩基施工水平,将水塔基础设计由灌注桩桩基改为筏形基础,对筏形基础沉降量进行复核验算,对水塔罐体结构设计进行优化并进行抗裂设计及验算,满足了规范和业主的使用要求。During water tower design and construction of Vientiane water supply network extension and intellectual upgrading project,geologic report and local pile foundation construction condition were considered to change the water tower foundation from filling pile foundation into raft foundation.The raft foundation settlement was checked and verified,structural design of water tower tank was optimized and crack design and verification were carried out,to satisfy the specification and the owner’s requirements.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49