检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王恩龙 Wang Enlong(Xinzhi Colliery,Huozhou Coal and Electricity Group,Huozhou,Shanxi 031412)
出 处:《江西煤炭科技》2020年第2期40-43,共4页Jiangxi Coal Science & Technology
摘 要:为保障10-430B工作面回采巷道复合顶板围岩的稳定,根据复合顶板的具体特征,通过分析预紧力在复合顶板中的分布规律及预紧力与预紧扭矩之间的关系,确定锚杆预紧扭矩为400 N·m,并结合复合顶板特征进行高预应力锚杆支护参数设计,在复合顶板巷道采用高预应力锚杆支护后进行巷道表面位移的观测,以验证支护效果。结果表明:10-430B1巷道采用高预应力锚杆支护后,巷道掘进期间顶底板及两帮的最大变形量分别为143 mm和203 mm,保障了复合顶板巷道围岩的稳定。To ensure the stability of the composite roof of the surrounding rock of the mining roadway in 10-430B working face,based on the specific characteristics of the composite roof, the article determines that the bolt preload torque is 400N·m and designs parameters of the high prestressed anchor support by analysing the distribution of the preload force in the composite roof and the relationship between the preload force and the preload torque, which guarantees the stability of the surrounding rock of the composite roof roadway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.143.199