作 者:刘烨华[1] 杨玉锋[1] 张奇[1] 王清雷 LIU Ye-hua;YANG Yu-feng;ZHANG Qi;WANG Qing-lei
机构地区:[1]北京市水利规划设计研究院,北京100048 [2]北京市大兴区永定河管理所,北京102601
出 处:《东北水利水电》2020年第5期40-42,I0002,共4页Water Resources & Hydropower of Northeast China
摘 要:文中考虑为南水北调北京段检修提供技术保障,建设试验平台开展1:1原型试验,以探索4m直径PC CP管节开挖更换技术的施工工艺,为国内首次采用4m直径PCCP的相关模型试验。试验中通过模拟演练应急抢修方案、施工组织,进行有关工艺、工序的现场测试,提出快速合理的抢修工期,总结工程施工经验、提出优化建议,提前攻克4m直径PCCP管道应急抢修过程中可能遇到的技术难题。In this paper,it is considered to provide technical support for the maintenance of the Beijing section of the south-tonorth water diversion project.A 1:1 prototype test is carried out on the construction of the test platform to explore the construction process of the excavation and replacement technology of the 4m diameter PCCP pipe section,which is the first relevant model test of 4m diameter PCCP in China.In the test,through the simulation and practice of emergency repair plan and construction organization,the site test of relevant technologies and procedures was conducted,the rapid and reasonable repair period was proposed,the construction experience was summarized and optimization Suggestions were put forward,and the technical difficulties that may be encountered in the emergency repair process of 4m diameter PCCP pipeline were overcome in advance.
分 类 号:TV131.6[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31